Project Executed
 
Acclaim has handled projects in various capacities - as technical consultants, turnkey suppliers and as CDM consultants. Acclaim has been involved with the following projects in one role or the other.
Arashi Hitech Biopower (P) Limited, Palladam, Tamilnadu:
 
As technical consultant for the 1.0 MW grid linked project which is the first of it kind in India. Project commenced on dual fuel basis initially and switched to 100% producer gas engines thereafter.
Acclaim also played the role of CDM consultant and registered Arashi as the first biomass based power project under the CDM with the UNFCCC.
Hindustan Pencils Limited, Baribrahmana, Jammu:
 
Acclaim played the role of technical consultant to the 200 kW project also commenced on dual fuel basis in 2003 and switched to 100% gas engines in 2005.
Apsara Pencils (P) Limited, Baribrahamana, Jammu :
 
Project similar to Hindustan Pencils. Commenced production almost at the same time both on dual fuel basis and on 100% producer gas engines in 2005.
Beach Minerals Company Limited, Tirunelveli, Tamilnadu:
 
Technical Consultants to the 1.5 MW captive power plant which was the largest plant in India as on that date.
Industrial Minerals Tirunelveli, Tamil nadu:
 
The first turnkey gasifier plant supplied by Acclaim. Plant delivering 1 MW of thermal energy using biomass gasifiers to replace 80 LPH of High Speed Diesel in rotary sand driers.
Swathi Ecogen (P) Limited, Chennai, Tamilnadu :
 
Acclaim played the role of CDM consultant for the 600 kW captive power plant
TANFAC Limited, Cuddalore, Tamilnadu :
 
Acclaim was the CDM consultant to this 3 MW thermal gasifier plant
 
  